Installing Components; Installing A Uslp2 - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Figure 14-31 Installing PGND Cables
(1) Ground bar on the inner side of the cabinet
Step 3 Route and bind the cables. For details, see
Step 4 Label the installed cables. For details, see Attaching a Cable-Tying Label.
Step 5 Run each cable that leaves the cabinet in a PVC corrugated pipe, and then tie the pipe to the
cable hole on the cabinet.
----End

14.4 Installing Components

When a DBS3900 is deployed outdoors with AC power supply, and the BBU is installed indoors,
you must install the SLPU and USLP2s in an outdoor APM30H.

14.4.1 Installing a USLP2

A USLP2 is installed in an SLPU, providing surge protection for RRU monitoring signals.
Context
Two USLP2s are installed in slots 2 and 3 of an SLPU, as shown in
Figure 14-32 Position for installing USLP2s
Issue 06 (2011-09-15)
14 Indoor Scenario with DC Power Supply (BBU Installed
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Indoors and RRU Powered Outdoors)
(2) PGND cable
13.5.1 Cabling
Requirements.
(3) Ground busbar
Figure
14-32.