10.6 Power-On Check

Before a DBS3900 starts operating, you must check the power-on status of the cabinet and
components in it.
The DBS3900 must be powered on within seven days after it is unpacked, and the period for
which the DBS3900 remains powered-off during maintenance must not exceed 48 hours.