Kubota WSM 05-E3B Series Workshop Manual page 39

Table of Contents

Advertisement

05-E3B, 05-E3BG, WSM
Injection Timing
1. Remove the injection pipes.
2. Remove the engine stop solenoid.
3. Turn the flywheel counterclockwise (viewed from flywheel side)
until the fuel fills up to the hole of the delivery valve holder (3) for
No. 1 cylinder.
4. After the fuel fills up to the hole of the delivery valve holder for No.
1 cylinder, turn back (clockwise) the flywheel around 1.6 rad
(90 °).
5. Turn the flywheel counterclockwise to set at around 0.44 rad
(25 °) before T.D.C..
6. Slowly turn the flywheel counterclockwise and stop turning when
the fuel begins to come up, to get the present injection timing.
7. Check to see the degree on flywheel.
The flywheel gas mark "1TC", "10" and "20" for the crank angle
before the top dead center of No. 1 cylinder.
8. If injection timing is out of adjustment, readjust the timing with
shims.
Injection timing
-1
(3000 min
(rpm))
Injection timing
Factory
-1
(3600 min
(rpm))
spec.
Injection timing
-1
(1800 min
(rpm))
NOTE
• The liquid gasket is not required for assembling.
• Shims are available in thickness of 0.20 mm (0.0079 in.), 0.25
mm (0.0098 in.), 0.30 mm (0.012 in.), 0.35 mm (0.014 in.) and
0.175 mm (0.00689 in.).
adjustments.
• Addition or reduction of shim (0.025 mm, 0.00098 in.) delays
or advances the injection timing by approx. 0.0044 rad
(0.25 °).
• In disassembling and replacing the injection pump, be sure
to use the same number of new shims with the same
thickness.
• The 0.175 mm thick shim is coated only on the lower face.
Therefore, do not use the 0.175 mm thick shim as the top
shim of the combination (injection pump side), because this
can cause oil leakage.
(1) Timing Line
(2) Alignment Mark
(3) Delivery Valve Holder
(4) Shim (Soft Metal Gasket Shim)
G-24
G GENERAL
D1005-E3B
0.3011 to 0.3272 rad
D1105-E3B
(17.25 ° to 18.75 °) before
D1305-E3B
T.D.C.
D1105-T-E3B
0.2837 to 0.3097 rad
V1505-E3B
(16.25 ° to 17.75 °) before
V1505-T-E3B
T.D.C.
0.3360 to 0.3621 rad
D1105-E3B
(19.25 ° to 20.75 °) before
V1505-E3B
T.D.C.
0.2575 to 0.2836 rad
D1005-E3BG
(14.75 ° to 16.25 °) before
D1105-E3BG
T.D.C.
0.2487 to 0.2748 rad
D1305-E3BG
(14.25 ° to 15.75 °) before
V1505-E3BG
T.D.C.
Combine these shims for
(5) Two-holes : 0.20 mm (0.0079 in.)
Two-holes : 0.175 mm (0.00689 in.)
(6) One-hole : 0.25 mm (0.0098 in.)
(7) Without hole : 0.30 mm (0.012 in.)
(8) Three-holes : 0.35 mm (0.014 in.)
W1023161
KiSC issued 12, 2007 A