Huawei SUN2000-90KTL Series User Manual page 69

Hide thumbs Also See for SUN2000-90KTL Series:
Table of Contents

Advertisement

SUN2000-(90KTL, 95KTL, 100KTL, 105KTL) Series
User Manual
● Sufficient slack should be provided in the PE cable to ensure that the last cable
● If the cable outer diameter does not match the rubber liner, the IP rating of the
● Do not route the cable with a crimped OT/DT terminal directly through the
● Ensure that the cable jacket is in the maintenance compartment.
● Ensure that AC terminations are secured. Failure to do so may cause the
● Do not adjust the cable when the sealing nut is tightened. Otherwise, the
Figure 5-10 Installing the AC output power cable
The cable colors shown in figures are for reference only. Select an appropriate cable according to
the local standards.
----End
Follow-up Procedure
Check that the cable is connected correctly and securely. Then seal the cable
gland. Clear the foreign matter from the maintenance compartment.
Issue 16 (2023-12-20)
NO TICE
bearing the force is the PE cable when the AC output power cable bears pulling
force due to force majeure.
device may be affected.
rubber liner in case it damages the liner.
SUN2000 to malfunction or damage to its terminal block by issues such as
overheating.
rubber liner may shift, which affects the IP rating of the device.
NO TE
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
60

Advertisement

Table of Contents
loading

Table of Contents