SUN2000-(90KTL, 95KTL, 100KTL, 105KTL) Series
User Manual
Figure 7-13 Power adjustment parameters
Table 7-7 Power adjustment parameters
Parameter
Remote power schedule
Schedule instruction valid
duration (s)
Issue 16 (2023-12-20)
Description
If this parameter is set to Enable, the inverter responds to
the scheduling instruction from the remote port. If this
parameter is set to Disable, the inverter does not respond to
the scheduling instruction from the remote port.
Specifies the time for maintaining the scheduling instruction.
When this parameter is set to 0, the scheduling instruction
takes effect permanently.
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interactions
92