Download Print this page

Mercia Garden Products 0628LOG233-V3 General Instructions Manual

Log cabin

Advertisement

Quick Links

General Instructions
0628LOG233-V3 & 0628LOG236-V3 (5x3m)
0628LOG233-V3: 5x3m (28mm) apex cabin
0628LOG236-V3: 5x3m (28mm) apex cabin with veranda
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a
circular saw when cutting
roof and oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628LOG233-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628LOG233-V3

  • Page 1 Winter = High Moisture = Expansion 0628LOG233-V3 & 0628LOG236-V3 (5x3m) Summer = Low Moisture = Contraction erected by two adults 0628LOG233-V3: 5x3m (28mm) apex cabin 0628LOG236-V3: 5x3m (28mm) apex cabin with veranda BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you...
  • Page 2 0628LOG233-V3 & 0628LOG236-V3 Please retain product label and instructions for future reference Overall Dimensions: Width = 5148mm Depth = 4134mm Log Board - 28x120x5000mm QTY 19 Height = 2869mm LB28-A-5000 Base Dimensions: Width = 4808mm Depth = 2804mm 3708mm (Without veranda)
  • Page 3: Pre-Assembly

    Please retain product label and instructions for future reference Veranda Components - 0628LOG236-V3 only Pre-assembly Bearer - 44x44x904mm QTY 4 Bearer - 44x44x2316mm QTY 10 F4444-904-PT F4444-2316-PT *Please note: Log Board - 28x120x1000mm QTY 4 Log Board - 28x120x1717mm QTY 4 Each board interlocks at LB28-B-1000 LB28-A-1717...
  • Page 4 Please retain product label and instructions for future reference Step 1 Step 2 Parts needed - No. 14 QTY 2 Parts needed - No. 14 QTY 2 No. 15 QTY 10 No. 15 QTY 10 Lay the Bearers (No. 14 Following the same method &...
  • Page 5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 4 (See Pre-Assembly) Step 5 Parts needed - No. 5 QTY 8 No. 6 QTY 8 Once you have laid 6 log boards (o No. 9 QTY 4 of the starter) up the door section, slide the assembled door frame (No.
  • Page 6 Please retain product label and instructions for future reference Step 6 (See Pre-Assembly) Step 7 Parts needed - No. 5 QTY 14 No. 7 QTY 14 Once you have laid the second No. 8 QTY 14 level of boards onto the assembly No.
  • Page 7 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 8 (See Pre-Assembly) Step 9 (See Pre-Assembly) Parts needed - No. 5 QTY 14 Parts needed - No. 9 QTY 1 No. 7 QTY 14 No.
  • Page 8 Please retain product label and instructions for future reference Step 12 Step 11 Parts needed - No. 16 QTY 5 Parts needed - No. 12 QTY 74 Place the rst two roof board’s Align the Roof Purlin(s) (No. (No. 12) onto the assembly on 16) into the cut out slots on each each side, making sure the boards gable top ensuring each ridge bar...
  • Page 9 Please retain product label and instructions for future reference Step 13 Step 14 Parts needed - No. 17 QTY 4 Parts neeeded - No. 13 QTY 43 Ensuring the roof boards are Place the rst oor board (No. 13) ush at the overhanging side and inside the building ush to the log meet at the apex, x the Eaves board on one side.
  • Page 10 Please retain product label and instructions for future reference Step 15 Step 17 Parts needed - No. 21 QTY 6 Roof Roof Parts needed - No. 22 Inside the building place the closure Cut the felt into seven strips lay trim (No.
  • Page 11 Please retain product label and instructions for future reference Step 19 Step 18 Parts needed - No. 18 QTY 4 Parts needed - No. 20 QTY 8 No. 19 QTY 4 Arrange the storm braces (No. 20) Align the fascia’s (No’s. 18 & around the building (internally).
  • Page 12 Please retain product label and instructions for future reference Veranda Steps: 0628LOG236-V3 only IMPORTANT: Pre-drill before xing screws. Step 1 Parts needed - No. V1 QTY 2 No. V2 QTY 5 Following the same method outlined in Step 1, lay the bearers (No’s.
  • Page 13 Please retain product label and instructions for future reference Step 3 IMPORTANT: Pre-drill before xing screws. Step 4 IMPORTANT: Pre-drill before xing screws. Parts needed - No. V3 QTY 4 Parts needed - No. V11 QTY 39 No. V4 QTY 4 No.
  • Page 14 Please retain product label and instructions for future reference Step 5 IMPORTANT: Pre-drill before xing screws. Step 6 IMPORTANT: Pre-drill before xing screws. Parts needed - No V12 QTY 1 Parts needed - No. V13 QTY 2 No. V14 QTY 2 No.

This manual is also suitable for:

0628log236-v3