Waterworld New Millennium Installation & Service Manual page 4

5-stage reverse osmosis drinking water system with booster pump
Table of Contents

Advertisement

INSTALLATION DIAGRAM FOR MILLENNIUM® RO SYSTEM
Sink
JGV-ASVPP1LF
(Angled Stop Valve)
Cold Water
Feed Supply
Stage 5: Carbon
Post Filter
Stage 4: TFC
Membrane
Stage 3: Carbon Block
Stage 2: Carbon Block
WARNING:
CONNECT YOUR SYSTEM TO THE COLD WATER SUPPLY ONLY. DO NOT USE A WATER
SUPPLY THAT IS MICRO-BIOLOGICALLY UNSAFE, OR OF UNKNOWN SOURCE WITHOUT
ADEQUATE DISINFECTION BEFORE OR AFTER THE SYSTEM.
Tubing
Directions
1/4" Green
Feed water supply line to inlet. Feed ball valve labeled "TO FEED"
3/8" Blue
Carbon post filter elbow labeled "TO FAUCET" to center threaded shank of faucet
3/8" Yellow
Carbon post filter tee labeled "TO TANK" to ball valve on storage tank
1/4" Red
Flow restrictor labeled "TO DRAIN" to air gap 1/4" drain/barb inlet at faucet air gap
3/8" Barb on air gap to DS-EZW6 Drain clamp
3/8" Red
(shown with optional air gap faucet)
3/8" Red Tubing
from Faucet to
Drain Clamp
1/4" Green Tubing
Color Coded Tubing-Optional Air Gap Faucets
3/8" Yellow Tubing
to Tank
Stage 1: Sediment Pre�lter
3
JGF-PP3212U7W
(Faucet Connector)
3/8" Blue Tubing
to Faucet
DS-EZW6
(Drain Saddle)
1/4" Red Tubing
from Flow Restrict
to Air Gap Optional Faucet
Storage Tank

Advertisement

Table of Contents
loading

Related Products for Waterworld New Millennium

Table of Contents