Atlas Copco LT 2 Instruction Book page 52

Industrial aluminium piston compressors
Hide thumbs Also See for LT 2:
Table of Contents

Advertisement

4. For the full feature units, also push the switch to position I to start up the refrigerant dryer. Approximately
10 minutes later, the nominal dewpoint will be reached.
5. Open the air outlet valve (AV).
LT Trolley with electrical motor
1. On LT check the oil level, which must be near the top of the red circle of sight-glass (SG). The minimum
level is the lower part of the red circle.
2. Set pilot valve (RV) in the unload position by turning the red handle 90 degrees. See section
of pilot
valve.
3. Attach the air lines to the air outlets.
50
To ensure optimum operational efficiency, do not use dryer on/switch repeatedly within a
short time period.
Wait at least 5 minutes to start the dryer again after stopping to allow pressure equalization.
Regularly drain condensate
Instruction book
Adjustment
2920 7089 90

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lt 3Lt 5Lt 7Lt 10Lt 15Lt 20

Table of Contents