Packaging Materials; Packaging For Fascia - IBM Storwize V5100 Quick Installation Manual

Hide thumbs Also See for Storwize V5100:
Table of Contents

Advertisement

Figure 13. Packaging materials
1
Enclosure
2
Top of shipping box, folded back
3
Foam protectors
4. With four or more persons, push the expansion enclosure sideways onto an adjacent flat bed lift. Keep
the remaining foam block protectors attached to the enclosure.
5. Remove the support rail kit from the box in which it was shipped (
16).
6. Remove the 4U and 1U fascia from the boxes in which they were shipped, as shown in Figure 14 on
page 17.
Figure 14. Packaging for fascia
1
4U fascia (front)
1
, as shown in Figure 12 on page
Chapter 2. Installing the system hardware 17