Installation And Configuration; Unpacking The Mi-2100R; Unpacking And Preparing The Mi-2100R's Rolling Wheels - Master Image MI-2100R Installation & Operation Manual

Stereoscopic digital 3d system
Table of Contents

Advertisement

4 Installation and Configuration

4.1 Unpacking the MI-2100R

1. Inspect the MI-2100R crate for any external damage.
2. Carefully remove the crate fasteners and crate top and sides using an 8mm socket and
power tools.
3. Loosen the shipping straps and remove the protective wrap.
4. Insure all items are included: MI-2100R, cover, installation kit box, spare polarizing filer
disk.

4.1.1 Unpacking and preparing the MI-2100R's rolling wheels

The unit is shipped with the rolling wheels locked. Once unpacked, turn the
orange rings in the wheel assembly to the left in order to raise the locking pads
and allow the unit to be rolled easily.
MI-2100R Rolling Wheel
MI-2100R Installation Kit Box
11
MI-2100R Installation & Operations Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MI-2100R and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents