Installation On The Beam; Control - HADEF 208/05 Installation, Operating And Maintenance Instruction

Monorail trolleys
Table of Contents

Advertisement

 There are distance tubes (5) and/or washers
(6) situated on the load bars (2) of the trolley.
 Dimension "X" is set by placing washers (6)
from the outer to the inner side ("X" increases)
or from the inner to the outer side ("X"
decreases).
 Washers (6) and rubber discs (depended on
type) leave a distance for the load hook. It is
important that the load hangs in the middle
under the beam so that the two side plates are
equally loaded.
 The suspension eye (9) (if existent) for bigger
load bolts must still be swivelling after it has
been secured.
 Tighten the hexagon nut (3) and safety nuts (4)
again.
 Check correct flange width "B" and dimension
"X". Adjustment must be repeated if necessary.
6.3

Installation on the beam

1 Tighten the hexagon nut (3) and safety nuts (4).
2 Push on the trolley at the face of the beam flange.
3 If this is not possible, the trolley can also be mounted
on the beam from below.
4 Therefore, remove the hexagon nut (3) and the safety
nut (4) on the side without gear.
5 Pull apart the side plates (1) as far until it is possible to
push the trolley onto the beam flange from below.
Afterwards, push the trolley together to correct gauge.
6 Secure the washers (6) and distance tubes (5) by
tightening the hexagon nuts (3) and the safety nuts (4).
CAUTION!
The distance <X= between the wheel flanges of the trolley wheels must be
for trolleys up to 3,2 t: 2-3 mm (1-1,5 mm each side) bigger and
for trolleys from 4 t up: 3-5 mm (1,5-2,5 mm each side) bigger than the flange width "B" of the beam
Version with thread load bar:
By turning the thread load bar the site plates will
be moved together or apart.
Caution!
When using the trolley you must permanently pay attention on the load bar that it not moves out and the
distance between wheel flange and girder section is always correct adjusted.
7

Control

Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their
operation. They must be authorized by the employer for the operation of the equipment. The employer must
ensure that the operating instructions are available near the equipment and that they are accessible for the
operating personnel.
Monorail push travel trolleys are moved by pushing the load.
Monorail hand geared trolleys are moved by pulling the hand chain.
8
1 side plates
2 load bars
3 hexagon nut
4 safety nuts
5 distance tubes
6 washers
7 ---
8 rubber disc (depended on type)
9 suspension eye
Illustration 1
5.52.695.00.01.04

Advertisement

Table of Contents
loading

This manual is also suitable for:

209/05208/05g209/05g

Table of Contents