HADEF 208/05 Installation, Operating And Maintenance Instruction page 11

Monorail trolleys
Table of Contents

Advertisement

16
Decommissioning
WARNING!
It is essential that the following points are observed in order to prevent damage to the equipment or critical
injury when the device is being decommissioned:
It is mandatory that all steps for decommissioning the machine are carried out in the indicated sequence:
 First secure the working area for decommissioning, leaving plenty of space.
 Read the chapter "Safety instructions".
 Disassembly is carried out in reverse order to the assembly.
 Please make sure that all operating material is disposed of in accordance with environmental regulations.
16.1
Temporary decommissioning
 Measures are as above.
 Also read the chapter <Transport and storage=.
16.2
Final decommissioning/disposal
 Measures are as above.
 After disassembly, ensure that the disposal of the equipment and any materials it contains is carried out
in accordance with environmental regulations.
5.52.695.00.01.04
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

209/05208/05g209/05g

Table of Contents