Montaje Del Quemador (Fig. 11); Conexión Tubo De Enfriamiento A La Mirilla; Assembling The Panels, Mod. Prextherm Rsw 720N÷1060N - Ferroli PREXTHERM RSW 92N Instruction For Use, Installation And Assembly

High-effi ciency boiler for liquid or gas fuels
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25

5.7 Montaje del quemador (Fig. 11)

The assembly of the burner at the boiler door must ensure perfect tightness for the products of
combustion. Once the burner is installed on the boiler, the space between the burner nozzle
and the refractory material on the door must be filled with the ceramic fiber padding (A) provi-
ded.
This prevents the door from overheating, which would result in irreversible warping.
The fuel connections to the burner must be placed so that the boiler door can open completely
with the burner installed.
It is advisable to place a rigid supporting base under the burner to prevent its full weight from
negatively affecting the door.
Models
L min. (mm)
92N-152N
230
190N-401N
250
525N-600N
250
720N-1060N
320
5.8 Conexión tubo de enfriamiento a la mirilla
La mirilla de control de la llama, está provista de una toma de presión 1 que debe conectarse,
Connecting the cooling tube to the fl ame inspection window
The flame inspection window is equipped with a pressure fitting (1). Once the interior screw is
loosened, it must be connected to outlet 2 on the burner using a silicone hose or copper pipe.
This allows the air blown back by the fan to cool the glass on the window and prevent it from
turning black. Failure to connect the hose or pipe to the window can cause the glass to break.
When disassembling the window for cleaning, check the condition of the seals, replacing them
if necessary. After closing, verify tightness.
5.9 Assembling the panels, mod. PREXTHERM RSW 720N÷1060N
a) Carefully position the side panels (pos. 1, 2 - 3 and 4), hooking them onto the supports on the boiler.
b) Assemble the U (pos. 12).
c) Attach the control panel to
the top front panel (pos. 5).
d) Rest the top panel (pos.
5), which includes the control
panel, against the side pa-
nel (pos. 1), which includes
springs, closing pins and nuts
(pos. 9-10-11).
e) Insert the instrument bulbs
in the sheaths (pos. 13) and
make the electrical connection
from the control panel to the
mains, burner, any pumps, etc.
It is advisable to insert the pro-
bes fully into the sheaths to im-
prove contact. Then secure the
capillary tubes with the springs.
Close the cover on the electri-
cal panel and pass the burner
plug through the openings on
the previous plate (pos. 14).
Cables and plastic hoses
must pass from the inside of
the casing and exit from the
rectangular opening under
the door (pos. 14).
f) Install the top panels (pos.
6-7-8), hooking them onto the
side panels (pos. 2-3-4), which include springs, closing pins and nuts (pos. 9-10-11)
32
EN
L max. (mm)
S
300
-
320
-
360.
-
390
239
cod. A73020801 - 2020-11
PREXTHERM RSW N
fig. 12
fig. 13
fig. 11

Advertisement

Table of Contents
loading

Table of Contents