Download Print this page

Kemlan CUBE Installation & Operating Instructions Manual page 8

Advertisement

Pop rivet or
screw brackets to
DETAIL A
the outside of the
outer casing
All 8"-10" assembled flues must
have the crimps pointing upwards
c
DETAIL
25
150
DETAIL B
NOTE:- When Decromesh / Heatshield is fitted, it must
finish a minimum of 600mm below the ceiling or extend
through the ceiling drop box into the outer flue casing
06/06/2023
INSTALLATION INSTRUCTION
KEMLAN CUBE
RAKED CEILING INSTALLATION
Short tube fits into flue
pipe. All flues should
be trimmed level
plain
Flash roof to outer
crimped
casing
(supplied by installer)
25
12mm
Air Gap
Raked ceiling trim
8" Decro with double
heat shield
Vented cap
10" Flue
8" Flue
6" Flue
B
Ver.20
A
Run a bead of silicone down
the vertical seam of the outer
casing to the flashing
All casing flue pipes must
be connected with pop
rivets supplied by installer
c
Bracing supplied by installer
Stainless steel flue pipe.
All flue pipes must be
connected with pop rivets
supplied by installer
Flue system to be installed
to suit AS/NZS 2918.2001
D
All 6" assembled flues must have
the crimps pointing downwards
DETAIL D
crimped
plain
8

Advertisement

loading