Assembly Instructions
4. Connect the Low-Pro's (A) top outlet port to your
vacuum with Hose (D) and Elbow (E) as shown
in [FIG. 3].
Connect the Low-Pro's side inlet port to your
tool with your vacuum's hose [FIG. 3].
Note: Both ports accept standard 2.5" hose cuffs
(OD ≈ 2.25").
D
To vacuum
5. Review [FIG. 4] for common air leak points.
Note: Any air leak will affect separation
performance. Make sure to check your dust drum
frequently so you do not overfill it.
Leak Point
(Outlet)
To Tool
E
FIG. 3
Leak Point
(Inlet)
Leak Point
(Low-Pro/
bucket)
FIG. 4
Optional Grounding Instructions
Recommended for fine dust situations or
electronically sensitive applications.
6. Install the Metal Tape (F) to the Lid Separator (A)
so that the inlet, outlet, and flange are attached by
a continuous, conductive path as shown in [FIG
5a]. The Metal Tape should wrap 1/4" around the
edge of each opening.
Note: For added grounding, attach a self-
supplied wire with a ring terminal on one
end and a washer tied to the other end when
installing one of the latches in step 2. The wire
must be long enough for the washer to lie on the
floor [FIG 5b].
F
Wire
Washer
FIG. 5a
FIG. 5b
oneida-air.com