Installation; Fitting Assembly; Hydrobloc Assembly - HBX HydroBloc 0100 Installation Manual

Table of Contents

Advertisement

Control Systems Inc.

InsTallaTIon

fITTInG asseMblY

To place each fitting into the port on the Hydrobloc
first place the o-ring over the fitting. Once the o-ring is
in place firmly twist and press the fitting into its
appropriate position as shown in the diagram below.

HYDRobloC asseMblY

1. backplate
Installed on the wall to mount the Hydrobloc.
2. supply fitting
This fitting is to be installed on the lower right hand
side of the Hydrobloc.
3. Delivery fitting
This fitting is to be installed on the top left hand side
of the Hydrobloc closest to the front of the
Hydrobloc.
H y d r o B l o c M a n u a l P a g e 6
4. Return Connection
This fitting is to be installed on the lower left hand
side of the Hydrobloc.
5. fitting Clip
Secure all three fittings to the Hydrobloc.
6. Terminal block
Seven pin terminal block used to hook up sensor inputs,
boiler/ chiller demand, and demand inputs.
H B X H Y D 0 1 0 0 H y d r o B l o c
V e r s i o n 2 . 1 0
© H B X C o n t r o l S y s t e m s I n c . 2 0 1 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hyd-0100

Table of Contents