Main Combi 30 HE Installation & Service Instructions Manual page 23

Hide thumbs Also See for Combi 30 HE:
Table of Contents

Advertisement

8.0
INSTALLATION
8.8
Making The Electrical Connections
To connect the mains input cable proceed as
follows:-
1. Slacken the facia panel securing screws and lift
the outercase panel so that its securing tabs are
clear of the facia. Remove the panel.
2. Completely undo the screws securing the facia
panel and hinge it down (Fig. 26).
3. Remove the control box cover securing screws.
Disengage the barbs on the control box from the
cover. Remove the cover (Fig. 27).
4. Slacken the cable clamp on the LH side of the
boiler chassis (Fig. 28). Insert the cable through the
clamp and route it to the terminal block.
5. Slacken the screws in the terminal block, connect
the input cable, and tighten the screws.
6. If an external control is to be connected it can be
done at this point. Run the input cable from the
external control through the second cable clamp on
the boiler chassis. Refer to the instructions supplied
with the control.
7. To connect external control(s) remove the link
between terminals 1 & 2. The 230V supply at
terminal 1 can be connected to the external
control. The switched output from the external
control must be connected to terminal 2. (Fig. 29).
NOTE: If the room thermostat being used
incorporates an anticipator it MUST be wired as
shown in Fig. 29
IMPORTANT: The external control MUST be
suitable for 230V switching.
8. Ensure that both mains input and, where fitted,
external control input cables have sufficient slack to
allow the control box to drop down. Tighten the
cable clamp(s) on the boiler chassis.
9. If the optional integral timer is to be used it should
be fitted at this point. Refer to the instructions
supplied with the timer. NOTE: An external frost
thermostat cannot be used with the integral timer.
8.9
Preliminary Electrical Checks
1. Prior to commissioning the boiler preliminary
electrical system checks should be carried out.
2. These should be performed using a suitable
meter, and include checks for Ground Continuity,
Resistance to Ground, Short Circuit and Polarity.
Control Box Cover
Fig. 27
Fig. 28
Cable Clamp
Fuse
Fused supply 3A
Always fit fast
230V ~ 50Hz
blow 2A fuse
Live (brown)
Neutral (blue)
Earth (green/yellow)
1
230V
2
Terminal Block
L
External
Controls
230 V
br
br
Selector /
b
Reset Switch
bk
bk
Key to Wiring
b - blue
br - brown
bk - black
r - red
g - green
Fig. 30
Facia Panel
Frost Thermostat
L
N
External Clock
230 V
N
br
SL
b
g/y
Room Thermostat
bk
IMPORTANT: If an integral timer is fitted to the
bk
boiler an external frost thermostat wired as
shown will not operate correctly. Only external
timers may be used in such installations, as in
the diagram.
Fig. 29
Functional Flow Diagram
Pump
br
bk
b
br
Fan
br
b
b
r
b
r
r
g
g
PCB
bk
bk
b
br
bk
r
r
g
g
Fig. 26
br
L
b
N
g/y
bk
1
2
bk
b
N
Pressure Switch
b
N
Flue Thermostat
Safety Overheat Thermostat
Central Heating
NTC Sensor
DHW
NTC Sensor
Gas Valve Modulator
Spark Electrode
Gas Valve
Condensate Trap
Flame Sensing Electrode
Hydraulic Differential Pressure Switch
DHW Flow Priority Microswitch
23