Decoration Panel Installation; Test Run; Test Run Using Pcb (Outdoor Unit); Test Run Using Remote Controller - Fujitsu AIRSTAGE AUUB18RLAV Installation Manual

Table of Contents

Advertisement

(Example) ADDRESS : 24
OPERATION
ON
indicator lamp
(Green)
OFF
TIMER
ON
indicator lamp
0.5s 0.5s 0.5s 0.5s
(Orange)
OFF
ON
FILTER
0.5s 0.5s 0.5s 0.5s 0.5s 0.5s 0.5s 0.5s
indicator lamp
OFF
(Red)
Refrigerant address example
(Example) ADDRESS : 30
OPERATION
ON
indicator lamp
1.0s
(Green)
OFF
TIMER
ON
indicator lamp
0.5s 0.5s 0.5s 0.5s 0.5s 0.5s
(Orange)
OFF
ON
FILTER
indicator lamp
OFF
(Red)
Setting details
Function
Item
number
01
Indoor unit address
02
Refrigeration address
For use with a remote controller, set all rotary switches to 0, and refer to "7.1. Setting the
address" for details.
All switches are set to 0 at the factory.
(2) Others
Indication pattern
Indicator Name
OPERATION indicator lamp (Green)
TIMER indicator lamp
(Orange)
FILTER indicator lamp
(Red)
(Example) Function : 31, Setting number : 2
OPERATION
ON
indicator lamp
0.5s
0.5s
(Green)
OFF
ON
TIMER
indicator lamp
0.5s 0.5s
(Orange)
OFF
ON
FILTER
0.5s
0.5s
indicator lamp
OFF
(Red)
8.

DECORATION PANEL INSTALLATION

• Operate according to the installation Manual DECORATION PANEL.
• Be sure to confi rm there is no gap between the panel and main unit after installing the
DECORATION PANEL.
En-15
1 cycle 12 sec
ON
10 sec
8 sec
1 cycle 12 sec
1.0s
1.0s
1.0s
1.0s
1.0s
1.0s
9 sec
OFF
Setting number
00~63
00~99
Indication pattern
Function number; tens place
(0.5s ON/0.5s OFF)
Function number; ones place
(0.5s ON/0.5s OFF)
Setting number: (0 - 9)
(0.5s ON/0.5s OFF)
1 cycle 12 sec
0.5s
0.5s 0.5s 0.5s
9 sec
11 sec
10 sec
0.5s
0.5s
9.

TEST RUN

9. 1.

Test run using PCB (Outdoor unit)

• Refer to the Installation Manual for the outdoor unit if the PCB for the outdoor unit is to
be used for the test run.
9. 2.

Test run using Remote Controller

• Refer to the Installation Manual for the remote controller unit to perform the test run
using the wireless remote controller unit.
• When the air conditioner is being test run, the OPERATION and TIMER indicators fl ash
slowly at the same time.
10.

CHECK LIST

Pay special attention to the check items below when installing the indoor unit (s). After
installation is complete, be sure to check the following check items again.
CHECK ITEMS
Has the indoor unit been installed
correctly?
Has there been a check for gas
leaks (refrigerant pipes)?
Has heat insulation work been
completed?
Does water drain easily from the
indoor units?
Is the voltage of the power source
the same as that indicated on the
label on the indoor unit?
Are the wires and pipes all
connected completely?
Is the indoor unit earthed
(grounded)?
Is the connection cable the
specified thickness?
Are the inlets and outlets free of
any obstacles?
Does start and stop air conditioner
operation by remote control unit or
external device?
After installation is completed, has
the proper operation and handling
been explained to the user?
If not performed correctly
Vibration, noise, indoor unit may
drop
No cooling, No heating
Water leakage
Water leakage
No operation, heat or burn damage
No operation, heat or burn damage
Short circuit
No operation, heat or burn damage
No cooling, No heating
No operation
CHECK
BOX

Advertisement

Table of Contents
loading

Table of Contents