Prometheus Panta Setup; Scope Of Delivery; Unpacking; Startup - Nano Temper Prometheus Panta User Manual

Table of Contents

Advertisement

4. Prometheus Panta setup

The Prometheus Panta should be installed by NanoTemper Technologies personnel to ensure safety
measures are taken and to confirm proper functionality of the instrument.

Scope of delivery

Upon receiving the system, please check package contents for completeness. The Prometheus Panta
system package contains the following items:
Item
Prometheus Panta system
User manual
Power supply and cable
Control PC

Unpacking

The Prometheus Panta system should only be unpacked and installed by trained NanoTemper
Technologies personnel to ensure proper functionality of the instrument upon delivery.

Startup

Connect the Prometheus Panta system to power by plugging in the 24V power supply. Connect the
Prometheus Panta system to the control PC using the Ethernet connection at the back of the instrument.
The system starts upon switching the power switch.

Cleaning

The Prometheus Panta system does not need any regular maintenance.
To clean the outside surface of the system, unplug the power supply at the back. Wipe the surface,
including the front display, with a cloth slightly dampened with water or ethanol (70%).
The capillary tray, including its mirrored surface, can be cleaned when the device is switched on and the
capillary tray drawer is in the open position (see 6.1). Clean the mirrored surface of the capillary tray with
a scratch- and dust-free tissue and 99.8 % ethanol prior to experiments.
14/22
Description
-
This user manual
24V power supply, network cable for connection to control PC
Laptop for Prometheus Panta system

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Prometheus Panta and is the answer not in the manual?

Questions and answers

Related Products for Nano Temper Prometheus Panta

Table of Contents