HOT-WATER NOZZLE - This operation must be carried out at the end of each working day
NOTE: the procedures described below can also be carried out when the machine is switched off.
GRILLE AND DRIP BASIN - This operation must be carried out at the end of each working day
2. Extract the basin.
Danger of burns
DO NOT
DRAINING TRAY
- This operation must be carried out at the end of each
working day
BODYWORK - This operation must be carried out at the end of each working day