Microsoft LF1-00055 Service Manual page 45

Table of Contents

Advertisement

j.
Secure Right Closure Steel – Using the back of the tweezers, press continuously and firmly along the
surface of the steel for 80 sec.
Tape Right Closure Steel – Place black tape over the steel. Black tape should fully cover steel and
k.
overlap onto the C-cover.
l.
Smooth Right Closure Steel Tape – Use Spudger to smooth out and flatten the tape to secure the steel.
Ensure that all metal keyboard covers have the mylar tape on top of the steel before final assembly of the
keyboard.
11. Fit C-cover – Follow steps 2-4 of the C-cover reassembly instructions. Do not install any Feet screws.
12. Check AB-cover alignment – Close the device and confirm flushness of feeler gauge to display module
cover across the entire front edge.
a.
If flush, move to next step in this section.
b. If not flush, follow steps for removing AB-hinge screws and steps for 9a thru 9c again until flush.
Then follow steps for C-cover reassembly.
13. rSSD Install – Follow steps for Procedure – Installation (rSSD) section
14. C-cover Install – Follow steps for Procedure – Installation (C-cover Keyboard metal type) section
15. Run SDT – Power on device. Validate full device functionality by running SDT tool.
a.
If an SDT failure occurs, assess failure to determine if caused by any improper or missed step in the repair
process and correct.
b. Any failure that is not correctable should result in device exchange.
16. Install Feet – If SDT tests pass and no further actions are to be performed on the device, follow steps for
Procedure – Installation (Non-Skid Feet) section
45
(page
(page
20).
M1179886
37).
(page
27).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Surface laptop 4Surface laptop 3

Table of Contents