GE TLE 625 UL S2 User Manual page 83

Table of Contents

Advertisement

NOTE !
Ensure the LED 1 (Rectifier) is lit before carrying out this procedure.
It indicates that the DC-link 1 and DC-link 2 has reached 400Vdc
/ Rectifier)!
Before performing the next procedure (4) make sure that the LED 3
(Booster/Battery charger) is lit.
3. Connect the Battery on the Unit to reconnect by closing the "External Battery Protections".
Synoptic diagram of the unit to reconnect
4. Insert the Inverter performing the command "Inverter ON" on the Unit to reconnect.
Perform the "Inverter ON" command from the screen:
Commands 1 / Inverter / ON.
After Soft-start of the Inverter, the Inverter connects automatically to the other Units of the Parallel
System.
LED ALARM turns Off and the LED LOAD PROTECTED must be lit.
The Synoptic Diagram, on all UPS units, must display the status "LOAD SUPPLIED BY INVERTER".
Synoptic diagram of the unit to reconnect
Modifications reserved
GE_UPS_USM_TLE_SUL_M62_1M0_2US_V010.docx
Critical Power
END OF PROCEDURE
(see screen MEASURES
Synoptic diagram of other units
Synoptic diagram of other units
User Manual TLE Series 625 - 750 - 1000 UL S2
Page 83/92

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tle 750 ul s2Tle 1000 ul s2

Table of Contents