Step 12 Optional: For The Installation Of The Circular Panel; Step 13 Connecting The Power And Communication Cables - Samsung AC TN4L Series Installation Manual

Hide thumbs Also See for AC TN4L Series:
Table of Contents

Advertisement

Installation Procedure
f When leakage occurs, check whether the indoor unit
is level and check the drain hose connection part,
drainpipe connection part and drain pump connection.
g When the drainage check is completed and
the condensed water remains on the drain pan,
remove the water.
Step 12 Optional: For the installation
of the circular panel
Making a circular opening on the ceiling
Use a paper compass printed on the indoor unit package.
(attached inside to the upper part)
1 Use a bolt or a pin to fix pivot point of the paper compass on
center of the ceiling. (in the middle of location for installation)
2
fixed in place.
16
English
3 Rotate the paper compass on its pivot point to draw a
line on the ceiling.
4 Rotate the paper compass diametrically to draw a
circle on the ceiling.
For the painting of the panel
Make sure to only apply paints and varnishes for resins
(ABS, HIPS) or paint thinners.
If you apply lacquers for general use on the panel, it
may lead to discoloration or erosion on the surface of
the panel.
Step 13 Connecting the power and
communication cables
CAUTION
Always remember to connect the refrigerant pipes
before performing the electric connections.
When disconnecting the system, always disconnect
the electric cables before disconnecting the
refrigerant pipes.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac tn4f series

Table of Contents