14 Commissioning and maintenance
Contents
Required test
Cautions
Preparations
Pages
1042 -Test sub-menu structure
1043
1044 Test operations
Binary output test (BO)
Binary input test (BI)
Cold load protection test (CLP)
Canceling supervision function (AMF)
Canceling UVBLK element (UV)
Canceling test flag
Forcibly signal control
GOOSE test (61850)
LED light (LED)
Mode test (MDCTRL)
Motor test (Motor)
SOTF test (SOTF)
Shot number test (ARC)
Thermal overload test (THM)
- 1041 -
6F2T0207 (0.01)
Pages
1045
–
1047
1047
1046
1046
1046
1046
1047
1045
1047
1047
1047
1046
1046
1046
GRE200 (5,6)