Section 10
Testing functionality by secondary injection
Test point
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15
P16
1.
Change the magnitude and angle of phase-to-earth voltage in phase L1 to achieve impedances
at test points P1, P2, ..., P16. At the same time, inject voltage magnitude of 0.0 V and current
of 0.0 A in phase L2.
2.
For each test point, observe that the output signals STELEMST and STNDZL1 are activated.
3.
Repeat the above test by injecting phase-to-earth voltage in phase L2 in accordance with test
points and steps described above and observe that the output signals STELEMST and
STNDZL2 are activated.
Quadrilateral characteristic
Change setting parameter CharStartZ< to Quadrilateral and set OpLoadEnch to On. Also, Set
X1Start, LineAng, ArgLd, and RFPEStart to default values. Ensure RLd value is lower than
RFPEStart.
Phase-to-phase fault
Test points that are to be considered for measurement accuracy of set impedance reach are shown
in
Figure 22
88
R
RFPEStart
0
-(X1Start / tan(LineAng))
-RFPEStart
-0.8 ∗ RFPEStart
-RLd
-RFPEStart
0.8 ∗ RFPEStart
RFPEStart
-0.8 ∗ RFPEStart
-RFPEStart
and
Table
24.
© 2017 - 2022 Hitachi Energy. All rights reserved
X
0
-X1Start
-X1Start
-0.8 ∗ X1Start
-0.8 ∗ RFPEStart∗
tan(ArgLd)
0
0
-0.8 ∗ RFPEStart ∗
tan(ArgLd)
-0.8 ∗ X1Start
0.8 ∗ RFPEStart ∗
tan(ArgLd)
0.8 ∗ X1Start
Railway application RER670
1MRK 506 377-UEN Rev. L
Comment
If OpLoadEnch = Off or 2I0
> I0MinOp
If 2I0 < I0MinOp
If 2I0 < I0MinOp
If OpLoadEnch = Off or 2I0
> I0MinOp
If 2I0 < I0MinOp
If 2I0 < I0MinOp
GUID-E11593FF-DABA-4AC6-9C1F-753102090602 v1
GUID-93A6A728-5076-4AD6-9176-B33CDFA0479E v1
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents