PRIOR TO INSTALLATION
1. Ensure cabinetry and
servicing specifications have
been met and clearances have
been considered.
Refer to the Planning Guide for
details.
fisherpaykel.com/specify
2. Ensure floor is level and clear
and a finished return has been
created.
3. Ensure power will remain
accessible following install to
allow access for any future
product maintenance.
Service holes should be smooth
with gromets installed where
required.
Refer to the services section
of the Planning Guide for more
details.
4