7.10.1 System Parameters

Tap Settings→System Parameters to enter the corresponding interface, as shown in the
following figure.
* The image shown here is for reference only.
Boot/Shutdown
Tap Boot/Shutdown to send the boot/shutdown instruction to the inverter.
For Australia and New Zealand, when the DRM state is DRM0, the "Boot" option will be
prohibited.
Date Setting/Time Setting
The correct system time is very important. Wrong system time will directly affect the data
logging and power generation value. The clock is in 24-hour format.
Software Version
Version information of the current firmware.

7.10.2 Operation Parameters

Running Time
Tap Settings→Operation Parameters→Running Time to enter the corresponding screen,
on which you can set "Connecting Time" and "Reconnecting Time".
PID Parameters
Tap Settings→Operation Parameters→PID Parameters to enter the corresponding
screen, on which you can set "PID Parameters".
figure 7-12 System Parameters
figure 7-13 Running Time