4-Unpacking - MCZ SUITE-CLUB-MUSA Hydromatic 24 M1 Installation Manual

Hide thumbs Also See for SUITE-CLUB-MUSA Hydromatic 24 M1:
Table of Contents

Advertisement

4-UNPACKING

PREPARATION AND UNPACKING
The packaging consists of a recyclable cardboard box according to RESY standards, recyclable EPS foam inserts, wooden pallets. All
packaging materials can be reused for similar use or eventually disposed of as urban solid waste, in compliance with the regulations in
force. After having removed the packaging make sure the product is intact.
Handle the product with suitable means paying attention to the applicable safety regulations in force. Do not turn the
packaging over and handle the ceramic parts with care.
The stoves are delivered in a single package with ceramic panels or steel sides packaged together with the structure and placed on top or
at the side. Open the package, remove the cardboard, polystyrene and any straps and position the stove in the preset place making sure
that it complies with the requirements.
The stove body or unit must always be kept in a vertical position when handled, and handled using carts only. Pay particular attention to
the door and its glass, protecting them from mechanical knocks that would compromise their integrity.
If possible, unwrap the stove near the chosen area of installation.
The packaging materials are neither toxic nor harmful.
MUSA WITH STEEL CLADDING PACKAGING
24
SUITE/CLUB WITH CERAMIC CLADDING PACKAGING (ABOVE)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suite-club-musa hydromatic 16 m1

Table of Contents