Check Operational Readiness; Connect Lin Bus; Example Application Under Windows 8 - Peak PLIN-USB User Manual

Hide thumbs Also See for PLIN-USB:
Table of Contents

Advertisement

2.3 Check Operational Readiness

1. Open the Windows Start menu.
2. Type Peak Settings and press |Enter|.
The window PEAK Settings appears.
3. Select LIN Hardware.
The connected CAN interface is displayed.

2.4 Connect LIN Bus

The transceiver of the LIN interface requires a power supply between 6 and 28 V
DC. This must be provided via pin 9 on the D-Sub connector.
To facilitate the connection, use the optional LIN connection cable for PC LIN
interfaces (IPEK-003013).
Pin
Assignment
1
None
2
None
3
None
4
LIN
5
LIN_GND
6
LIN_GND
7
None
8
None
9
LIN_V
2.5 Example Application under Windows
As an example application for accessing the LIN interface, run the LIN monitor
PLIN-View Pro from the Windows Start menu.
2   Installation
PLIN-USB
User Manual 2.1.0
© 2023 PEAK-System Technik GmbH
D-Sub plug on LIN interface
Bat
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ipeh-004052

Table of Contents