Finishing The Outdoor Unit Installation; To Finish The Outdoor Unit Installation; Configuration; Facility Setting - Daikin RXA20A5V1B8 Installation Manual

R32 split system air conditioners
Table of Contents

Advertisement

8 Finishing the outdoor unit installation

8
Finishing the outdoor unit
installation
8.1
To finish the outdoor unit
installation
DANGER: RISK OF ELECTROCUTION
▪ Make sure that the system is earthed properly.
▪ Turn OFF the power supply before servicing.
▪ Install the switch box cover before turning ON the
power supply.
1 Insulate and fix the refrigerant piping and cables as follows:
d
c
a
e
b
f
g
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Field wiring (if applicable)
e
Liquid pipe
f
Liquid pipe insulation
g
Finishing tape
2 Install the service cover.
9

Configuration

9.1

Facility setting

Use this function for cooling at low outdoor temperature. This
function is designed for facilities such as equipment of computer
rooms. NEVER use in a residence or office where people occupy the
space.
9.1.1

To set the facility mode

When cutting jumper J6 on the PCB, the operation range will expand
to –15°C. The facility mode will stop if the outdoor temperature drops
below –20°C and resume when the temperature rises again.
To cut jumper J6
1 Remove the top plate of the outdoor unit.
2 Remove the front plate.
3 Remove the drip proof cover.
4 Cut jumper J6 on the outdoor unit PCB.
Installation manual
12
INFORMATION
▪ The indoor unit may produce Intermittent noise due to
the outdoor unit fan turning ON and/or OFF.
▪ Do NOT place humidifiers or other items which might
raise humidity in rooms when you use the facility mode.
▪ Cutting jumper J6 sets the indoor unit fan to the highest
speed.
▪ Do NOT use this setting in residences or offices with
people.
10

Commissioning

NOTICE
General
commissioning
commissioning instructions in this chapter, a general
commissioning checklist is also available on the Daikin
Business Portal (authentication required).
The general commissioning checklist is complementary to
the instructions in this chapter and can be used as a
guideline and reporting template during commissioning and
hand-over to the user.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
10.1

Checklist before commissioning

1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.
The indoor unit is properly mounted.
The outdoor unit is properly mounted.
The system is properly earthed and the earth terminals
are tightened.
The power supply voltage matches the voltage on the
identification label of the unit.
There are NO loose connections or damaged electrical
components in the switch box.
There are NO damaged components or squeezed
pipes on the inside of the indoor and outdoor units.
There are NO refrigerant leaks.
The refrigerant pipes (gas and liquid) are thermally
insulated.
The correct pipe size is installed and the pipes are
properly insulated.
The stop valves (gas and liquid) on the outdoor unit are
fully open.
The following field wiring has been carried out according
to this document and the applicable legislation between
the outdoor unit and the indoor unit.
Drainage
Make sure drainage flows smoothly.
Possible consequence: Condensate water might drip.
The indoor unit receives the signals of the user interface.
checklist.
Next
to
the
RXA-A8
R32 Split system air conditioners
3P748894-1A – 2023.09

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rxa25a5v1b8Rxa35a5v1b8Rxa-a8

Table of Contents