Unigas RX90 Installation Manual page 18

Table of Contents

Advertisement

Burners: RX515-RX520
Gas train - 7
Gas train with valves group VGD 20/40 with built-in gas pressure governor + VPS504 gas proving system
1
Gas train - 8 (Rp2)
Gas train with valves group MBC 1200SE(2 valves + gas filter + pressure governor) + VPS504 gas proving system
1
Gas train - 9 (DN65/80/100)
Gas train with valves group MBC 1900/3100/5000SE (2 valves + gas filter + pressure governor) + VPS504 gas proving system
1
Key
1
Burner
2
Butterfly valve
3
Gas proving system
4
Maximum gas pressure switch (option*)
5
Minimum gas pressure switch
6
Gas filter
7
Bellows unit
* * Note: the high gas pressure switch can be mounted either upstream or downstream the gas valve but upstream the butterfly gas
valve (see item no.4 in the scheme above).
4
2
11
15
15
18
4
2
15
15
19
4
2
3
15
15
8
11
14
15
18
19
MANUFACTURER
4
5
6
5
14
3
MANUFACTURER
4
5
3
5
14
MANUFACTURER
4
5
5
14
Manual cutoff valve
VGD Valves group
Pressure stabiliser with filter
Pilot gas valve
MBC Valves group (2" with filter provided)
MBC Valves group (DN65/80/100)
18
INSTALLER
7
8
7
8
INSTALLER
7
8
7
8
INSTALLER
7
6
8
7
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rx91Rx510Rx515Rx520

Table of Contents