Piping Installation; Preparing Refrigerant Piping; Refrigerant Piping Requirements - Daikin RXTJ30A2V1B Installer's Reference Manual

Table of Contents

Advertisement

7 Piping installation

In this chapter

7.1 Preparing refrigerant piping

7.1.1 Refrigerant piping requirements

Refrigerant piping diameter
Refrigerant piping material
RXTJ-A_RXTA-C_RXTM-A_RXTP-A
R32 split series
4P728168-1 - 2023.03
7.1
Preparing refrigerant piping ...................................................................................................................................................
7.1.1
Refrigerant piping requirements ...........................................................................................................................
7.1.2
Refrigerant piping insulation..................................................................................................................................
7.1.3
Refrigerant piping length and height difference ...................................................................................................
7.2
Connecting the refrigerant piping..........................................................................................................................................
7.2.1
About connecting the refrigerant piping...............................................................................................................
7.2.2
Precautions when connecting the refrigerant piping............................................................................................
7.2.3
Guidelines when connecting the refrigerant piping..............................................................................................
7.2.4
Pipe bending guidelines .........................................................................................................................................
7.2.5
To flare the pipe end..............................................................................................................................................
7.2.6
Using the stop valve and service port....................................................................................................................
7.2.7
To connect the refrigerant piping to the outdoor unit .........................................................................................
7.3
Checking the refrigerant piping..............................................................................................................................................
7.3.1
About checking the refrigerant piping...................................................................................................................
7.3.2
Precautions when checking the refrigerant piping ...............................................................................................
7.3.3
To check for leaks...................................................................................................................................................
7.3.4
To perform vacuum drying ....................................................................................................................................
CAUTION
Piping and joints of a split system shall be made with permanent joints when inside
an occupied space except joints directly connecting the piping to the indoor units.
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant. Use
phosphoric acid deoxidised seamless copper for refrigerant piping.
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
Foreign materials inside pipes (including oils for fabrication) must be
≤30 mg/10 m.
Liquid piping
Ø6.4
Piping material: phosphoric acid deoxidised seamless copper
Flare connections: Only use annealed material.
Piping temper grade and thickness:
 7].
Pipe outer diameter (mm)
7
Piping installation
|
"2  General safety
Gas piping
Ø9.5
Installer reference guide
31
31
32
32
32
33
33
34
35
35
36
37
38
38
38
39
39
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents