Accessories List; Installation - ESAB EASY-WELD SSR 400 Instructions Manual For Installation, Operation And Maintenance

Fully thyristorised welding rectifier (mma)
Table of Contents

Advertisement

ACCESSORY LIST
FUSE ELEMENT
FUSE ELEMENT

INSTALLATION

a) Capacity of equipment
INPUT VOLTAGE
FREQUENCY & PHASE
MAXIMUM RATING OF EQUIPMENT
CAPACITY OF FUSE (B CLASS)
INPUT CABLE
OUTPUT CABLE
− Provide a Switch Box for every Welding Power Source, and use designated fuse
− Tolerance of Power Voltage Variation is ± 10% of rated input voltage.
− 100 Amps MCB to be used as alternative to SFU.
b) Installation place
− Install in the place where less moisture and dust exist. Avoid direct sunlight and
rain, and maintain ambient temperature within –10
− Keep the welding power source at least 20 cm. away from the wall (if any).
− In case of installation of more two units side by side, a distance of more than 20
cm is recommended between the two power sources.
− Use a shield to protect the welding arc in case of excessive air draft.
3A
1A
EASY WELD
SSR-400
21.6 KVA
32 Amps HRC
2
8mm
or more
50mm
Minimum
4
1 Piece
1 Piece
EASY WELD
SSR-600
415 V ± 10% AC
50 Hz, 3 PHASE
40 KVA
60 Amps HRC
2
22m
or more
2
(Cu)
70mm
Minimum
o
o
to 45
C as much as possible.
2
(Cu)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Easy-weld ssr 600

Table of Contents