Packing And Unpacking The Unit - ComfortStar CPA-09B Owner's Manual & Installation Manual

Middle static pressure duct type air conditioner, indoor/outdoor unit
Hide thumbs Also See for CPA-09B:
Table of Contents

Advertisement

Packing and unpacking the unit

Instructions for packing unpacking the unit:
Unpacking:
Indoor unit:
1.Cut the packing belt.
2. Unpack the package.
3. Take out the packing cushion and packing support.
4. Remove the packing lm.
5. Take out the accessories.
6. Lift the machine out and lay it at.
Outdoor Unit
1. Cut the packing belt.
2. Take the unit out of the package.
3. Remove the foam from the unit.
4. Remove the packing lm from the unit.
Packing:
Indoor unit:
1. Put the indoor unit into the packing lm.
2. Put the accessories in.
3. Place the packing cushion and packing support.
4. Put the indoor unit into the package.
5. Close the package and seal it.
6. Using the packing belt if necessary.
Outdoor unit:
1. Put the outdoor unit into the packing lm.
2. Put the bottom foam into the box.
3. Put the outdoor unit into the package, then put the upper packaging foam on the unit.
4. Close the package and seal it.
5. Using the packing belt if necessary.
NOTE:
Please keep all packaging items if you may need in the future.
Page 40

Advertisement

Table of Contents
loading

Table of Contents