Cch series mini-splits -13 seer air conditioner (31 pages)
Summary of Contents for ComfortStar FPA-18
Page 1
Indoor Unit:FPA-18 FPA-24 FPA-36DU FPA-48DU Outdoor Unit:CPP018CD(O) CPP024CD(O) CPP036CD(O)-DU CPP048CD(O)-DU If used as MULTI unit, please refer to the Installation & operation manuals packed with outdoor unit.
Page 5
Wiring connection port Drain discharge port Fresh air intake Refrigerant pipe hole Hanging arm Capacity (Btu/h) 1068 18K / 24K inch 42.05 26.57 9.25 38.70 1285 1200 inch 50.59 26.57 9.25 47.24 1650 1565 inch 64.96 26.57 9.25 61.61...
6. OUTDOOR UNIT INSTALLATION NOTE 6.1 Installation Place All the pictures in this manual are for explanation The outdoor unit should be installed in the location that purpose only. They may be slightly different from the meets the following requiements: air conditioner you purchased(depend on model).The actual shape shall prevail.
7.1 Vacuum with vacuum pump Model CPP009CD(O) Use the vacuum pump which vacuum level lower than inch 30.3 11.8 21.9 33.1 19.2 11.7 -0.1MPa and the air discharge capacity above 40L/min. CPP012CD(O) inch 31.5 13.1 21.8 34.3 20.2 13.4 The outdoor unit is not necessary to vacuum, don’t open the CPP018CD(O) outdoor unit gas and liquid pipe shut-off valves.
The Procedure of Connecting Pipes 8. INSTALL THE CONNECTING PIPE Drill a hole in the wall (suitable just for the size of the wall conduit), then set on the fittings such as the wall conduit and Check whether the height drop between the indoor unit its cover.
Page 10
Table 8-3 Connect the indoor unit at first, then the outdoor unit. Tightening torque N.M (Turn clockwise to close) Stop Maintenance nut Bend the tubing in proper way. Do not harm to them. Valve size Shaft (valve body) (Valve lid) Ø6.4 5.4~6.6 13.5~16.5...
9. CONNECT THE DRAIN PIPE Manifo ld valv e Pressu re meter Multi-m eter -76 c mHg Install the drainpipe of the indoor unit Hi-leve r Lo-lev er Charg e hos e Charg e hos e You can use a polyethylene tube as the drainpipe Vac uum p ump (out-dia.1.46-1.54in, in-dia.1.26in).
Install the drain joint of the outdoor unit NOTE Remark per EMC Directive 2004/108/EC Fit the seal into the drain joint, then insert the drain joint into the For to prevent flicker impressions during the start of the base pan hole of outdoor, rotate 90° to securely assemble them. compressor (technical process) following...
11. TEST OPERATION Wiring figure 10.2 (Refer to Fig.10-1 Fig.10-8) The test operation must be carried out after the entire installation has been completed. 10.3 Outdoor unit Please confirm the following points before the test operation: Remove the electric parts cover from the outdoor unit. The indoor unit and outdoor unit are installed properly.
Page 14
CAUTION The power supply must comply with the rating label. Wiring figure Indoor & Outdoor connection: CAUTION The wiring must be operated according to the wiring scheme,or it damages the unit. Before obtaining access to terminals, all supply circuits must be disconnected.
Page 15
TECHNICAL BULLETIN Heat Sink Compound (Thermal Paste) Make sure to use Heat Sink Compound (not provided) when replacing Mini-Split electronic boards. Clean up thoroughly old paste on chips located underneath the board, and radiator (fin surface). Evenly spread new paste on chips and radiator, and gently screw board back on radiator to maximize heat exchange.
Need help?
Do you have a question about the FPA-18 and is the answer not in the manual?
Questions and answers