Smartstart Preheat Operation; About The Smartstart Preheat System - Rinnai INFINITY 26 Smartstart Operation & Installation Manual

Water heater with preheat function
Hide thumbs Also See for INFINITY 26 Smartstart:
Table of Contents

Advertisement

SMARTSTART PREHEAT OPERATION

ABOUT THE SMARTSTART PREHEAT SYSTEM

7
3
2
1
1
PREHE AT BUTTON
Used to start and stop preheater.
_____-------_
Preheat Function
The Smartstart preheat system is fitted within this appliance. When the "Preheat" function is activated
and used in accordance with these instructions, water in the pipework connected between the water
heater and the hot water outlets in your house is warmed before any outlets are opened. This results
in water savings and reduced waiting time for heated water at the outlets.
The "Preheat" function is activated as follows:
1.
Ensure that the hot water unit is on (temperature digits are displayed in the digital monitor
If more than one controller is fitted press the 'Transfer'
desired controller, the 'Controller On'
assigned to this controller and that the hot water unit is ready to deliver hot water.
2.
Select the desired temperature using the 'Temperature'
temperature is displayed in the digital monitor
3.
Press the 'Preheat'
will illuminate, signifying that the preheat system has been activated.
4.
Wait approximately two minutes before opening an outlet. This will allow the water in the
pipework to be warmed.
The waiting time may be longer or shorter than two minutes depending on your
particular installation configuration.
NOTE
The "Preheat" function is cancelled 5 minutes after activation and the 'Preheat'
indicator will go out. This is to conserve energy. To reactivate, simply repeat
steps 2-4 above.
After using the Shower Saver / Bath Fill function wait 30 seconds before
activating the "Preheat" function. Attempting to use the "Preheat" function
earlier will result in voice prompts being repeated until the system is reset. The
system can be reset by pressing the 'On /Off' button twice.
Other Controller Functions
Controller functions such as temperature control and transfer of priority between multiple controllers
is not affected by the operation of the preheat. Such functions are described in the applicable sections
of this manual.
Rinnai Australia
5
7
8
6
2
5
1
8
6
4
2
PREHE AT INDICATOR
Indicates that preheater is activated.
____
5
indicator will illuminate to confirm that priority has been
1
button once. The 'Preheat'
14
3
3
5
DIGITAL
CONTROLLER ON
MONITOR
INDICATOR
4
6
ON/OFF
TEMPER ATURE
BUTTON
BUTTONS
button to pass on priority to your
8
6
buttons until the required
.
3
2
indicator and the 'In Use'
4
3 7
2
6
5
7
WATER HEATER
'IN USE' INDICATOR
8
TRANSFER
BUTTON
3
7
indicators
Operation Manual
1
8
4
).

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INFINITY 26 Smartstart and is the answer not in the manual?

This manual is also suitable for:

Reu-vr2626wgp

Table of Contents