0. Changing The Voltage Of 100/200V - JUKI LK-1901AN Instruction Manual

Table of Contents

Advertisement

10. Changing the voltage of 100/200V
WARNING :
To prevent personal injuries caused by electric shock hazards or abrupt start of the sewing
machine, carry out the work after turning OFF the power switch and a lapse of 5 minutes or more.
To prevent accidents caused by unaccustomed work or electric shock, request the electric expert
or engineer of our dealers when adjusting the electrical components.
It is adaptable to the voltage of single phase 00V to 20V/3-phase 200V to 240V by changing the voltage
changeover connector mounted on FLT p.c.b.
(Caution) When the changing procedure is wrong, the control box will be broken. So, be very careful.
A
WHITE
BLACK
RED
GREEN/
YELLOW
B
WHITE
BLACK
RED
GREEN/
YELLOW
C
WHITE
BLACK
RED
GREEN/
YELLOW
1
(Plug side)
WHITE
BLACK
RED
GREEN/
YELLOW
(Plug side)
WHITE
BLACK
RED
GREEN/
YELLOW
(Plug side)
WHITE
BLACK
RED
GREEN/
YELLOW
36
Changing procedure of the changeover connector
. Turn OFF the power source with the power switch
after confirming that the sewing machine has
stopped.
2. Draw out the power cord from the power plug
socket after confirming that the power switch is
turned OFF. Then wait for five minutes or more.
3. Remove the front cover.
4. Remove four screws fixing the rear cover of the
control box and slowly open the rear cover.
A. In case of using with 3-phase 200V to 240V
• Changing the changeover connector
Connect to 200V the 00/200V changeover
connector of FLT p.c.b. 1 located on the side
of the Box Side of the control box.
• Connect the crimp style terminal of AC input cord
to the power plug as shown in the figure.
B. In case of using with single phase 100V to 120V
• Changing the changeover connector
Connect to 00V the 00/200V changeover
connector of FLT p.c.b. 1 located on the side
of the Box Side of the control box.
• Connect the crimp style terminal of AC input cord
to the power plug as shown in the figure.
(Caution) Securely perform the insulation
treatment to the red terminal which is
not used with insulation tape or the like.
(When the insulation is insufficient,
there is a danger of electric shock or
leakage current.)
C. In case of using with single phase 200V to 240V
• Changing the changeover connector
Connect to 200V the 00/200V changeover
connector of FLT p.c.b. 1 located on the side
of the Box Side of the control box.
• Connect the crimp style terminal of AC input cord
to the power plug as shown in the figure.
(Caution) Securely perform the insulation
treatment to the red terminal which is
not used with insulation tape or the like.
(When the insulation is insufficient,
there is a danger of electric shock or
leakage current.)
5. Check that the change has been performed without
fail before closing the rear cover.
6. Be careful that the cord is not pinched between
the rear cover and the control box main unit. Close
the rear cover while pressing the lower side of rear
cover, and tighten four screws.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lk-1902anLk-1903anLk-1903an-305

Table of Contents