Toro TimeCutter 79335 Operator's Manual page 11

50in bagger
Table of Contents

Advertisement

5
Installing the Bagger Top
Parts needed for this procedure:
2
Grass Bag
1
Upper bagger tube
Procedure
1. Install the bagger top to the bagger frame. Rotate the
bagger top to align the key holes in the bagger top
brackets with the keys in the posts on the bagger frame
(Figure 17). Slide the brackets over the posts and rotate
the bagger top down to the operating position.
Note: The bagger top is easier to install if two people
work together.
1
2
3
4
Figure 17
1. Bagger top
2. Bagger frame
3. Key hole
5
6
G014888
4. Bracket, bagger top
5. Key
6. Post
2. Lift the bagger top and install the bags by sliding the
bag frame hooks onto the retaining brackets (Figure
18).
4
3
G005672
1. Bag
2. Bagger frame
3. Lower the bagger top onto the bag (Figure 19).
4. Install the upper bagger tube. Insert the curved end
into the opening in the bagger top. Make sure the
flared end with the retention post is pointing down and
froward in preparation to be mated with the Finishing
Kit.
11
1
2
Figure 18
3. Retaining bracket
4. Bag frame hook
G005757
Figure 19

Advertisement

Table of Contents
loading

Table of Contents