Download Print this page

Pentair INTELLICHLOR COMSYS-4 Installation Manual page 6

Salt chlorinator commercial system

Advertisement

4
Assemble the Manifold
1. Place an o-ring into groove on union coupling.
2. Place each cell on the manifold and tighten coupling nut securely. Be sure the o-ring stays
in place. Note: Cells labeled PRIMARY and SECONDARY can be placed anywhere in
the manifold, they do not need to be in a specific location.
3. Glue the manifold into the system plumbing at desired location, either horizontal or vertical.
Make sure the cells are readable and the buttons can be pressed if needed.
CAUTION: Do not install upside down!
4. Verify water flow direction See the FLOW arrow located on the IntelliChlor cell near the
input coupling.
IMPORTANT! MANIFOLD ASSEMBLY AND INTELLICHLOR CELL MUST BE
INSTALLED IN THE VERTICAL POSITION, AS SHOWN BELOW.
DO NOT MIX OLD AND
NEW MANIFOLD PARTS.
MANIFOLD
DIMENSIONS MAY NOT
BE BACKWARDS
COMPATIBLE.
Union coupling nut
IntelliChlor Electronic Chlorine Generator COMSYS-4 Installation Guide
Manifold
O-ring
Outlet
Inlet
Coupling

Advertisement

loading

This manual is also suitable for:

520971