Contents General information ........................3 Checking scope of supply and electrical ratings ................ 3 Operating instructions ........................ 3 Instruction ..........................3 Maintenance and customer service ................... 3 Technical specifications ......................4 Functional description ........................ 4 Air/oil flow schematic........................4 Installing flange and burner......................5 Connecting to power supply.......................
General information 1. General information An oil-fired system must be installed in compliance with a number of regulations and requirements. It is therefore the duty of the installer to be familiar with all applicable regulations and requirements. Installation, start-up and maintenance must be performed with utmost care. The burner must not be operated in rooms with high levels of air humidity (laundry rooms), dust or corrosive vapours.
Install flange and burner 9.Install flange and burner Attach the burner flange and the seal to the heat generator. 10.Connect to power supply 7-pin • Connect the burner to the power supply using the supplied connector unit as indicated in the wiring diagram.
Oil pump 12. Oil pump The oil pumps serve as delivery units, pumping oil into the burner tank. The atomisation of the oil is not dependent on the oil pressure. Suntec oil pump: = feed = return = pressure pipe connection = pressure measuring connection = vacuum measuring connection = pressure adjustment...
Function testing the control unit 15. Function testing the control unit Carry out the following checks after start-up and after the burner has been serviced: • Warm restart with covered flame failure controller: The control box must indicate a fault once the safety time has elapsed. •...
Adjustment table Measuring the photocurrent (MZ 770S only) To measure the photocurrent, disconnect the plug unit from the flame failure controller and install the pair of Control unit bottom part measuring cables* between the plug and socket unit. Both measuring connections should be connected to 500µA 200µA the measuring instrument.
Settings for primary airflow 17. Settings for primary airflow The primary airflow should be set using the pressure regulator (1) according to the required burner output. The information given in the diagram can be used as guide values. Higher-viscosity fuels require higher air pressures. 18.
Flue connection 19. Flue connection The prerequisite for perfect operation of the furnace is a correctly dimensioned flue. Dimensioning is effected in accordance with DIN 4705 in consideration of DIN 18160 and based on the boiler and burner outputs. For operation on a sliding basis, provide flues as per DIN 18160 part, group 1. The flue gas mass flow of the total rated heat output must be factored into the calculation.
Circuit diagram 22. Circuit diagram Boiler controller Flame detector MZ770 = blue Heating coil 1100 W br = brown Ext. fuse ge = yellow Control thermostat gr = grey Ext. temperature control grü = green Ext. safety temperature limiter sw = black Safety thermostat (STB) = red Ext.
Troubleshooting 23. Troubleshooting Observation Cause Remedy Open the water drain cock on the burner tank, Oil not combustible due to sludge and / or water drain off sludge and water or use a higher-grade heating oil Refill tank with oil Oil tank empty Oil level in burner tank too high Correct the oil level by draining off oil by means...