Combustion Head Setting; Burner Start-Up Cycle - Riello RDB3.2 G5 41/50 RDB3.2 G5 50/58 Installation, Use And Maintenance Instructions

Kerosene burners
Table of Contents

Advertisement

8.8

Combustion head setting

This is done when fitting the nozzle, with the blast tube removed.
It depends on the output of the burner and is carried out by rotat-
ing the regulating rod, till the terminal plane of the blast tube is
level with the set-point, as indicated in the schedule.
8.9

Burner start-up cycle

Normal
Thermostat
Motor
Ignition transformer
Valve
Flame
Lock-out lamp
Lock out is indicated by a lamp on the control box (3, Fig. 1 to
page 8)
Start-up, calibration and operation of the burner
~ 12s
D5398
Lock-out due to failure to light
~ 12s
21
GB
Terminal plane of the blast tube
Regulating rod
2
5
3
1
Shutter
Blast tube
~ 5s
Fig. 20
D5229
Fig. 21
20158133

Advertisement

Table of Contents
loading

This manual is also suitable for:

2015783920157840

Table of Contents