Lenovo 7X19 Setup Manual page 39

Hide thumbs Also See for 7X19:
Table of Contents

Advertisement

"8-bay backplane + 8-bay backplane" on page 36
"8-bay backplane + AnyBay backplane" on page 37
Two processors installed
Four processors installed
"AnyBay backplane + AnyBay backplane" on page 41
Two processors installed
Four processors installed
Important:
1. Make sure all the signal cables go through the cable guides.
Figure 23. Cable guide locations
2. Connect the direct NVMe signal cables to the NVMe connectors on the processor and memory
expansion tray.
Figure 24. Connecting NVMe cables to the processor and memory expansion tray
.
Chapter 2
Server components
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

7x18Thinksystem sr850

Table of Contents