Download Print this page

Samsung Generation 6 Installation Manual page 61

Advertisement

Smart Plumb Compact Installation
Pipe Connections
Reference
Description
A
H.P Flow
B
H.P Return
C
Heating Return
D
Heating Flow Zone 1
E
Heating Flow Zone 2
F
Heating Flow Zone 3
G
Hot Outlet
H
Cold Inlet
All the pipework connections are off the top section of the casing. Upon filling and commissioning,
ensure all connections are completely watertight.
Electrical Entry Point
A lack of safety devices can lead to potentially fatal injuries, all necessary safety devices must be
installed correctly in the system. The hot and cold pipework are required to be correctly bonded and
connected to the earth line.
All electrical wiring must be carried out by a qualified electrician and be installed in accordance with
current I.E.E Wiring Regulations
Value
28mm
28mm
28mm
22mm
22mm
22mm
22mm
22mm
Heat Pump Installation Guide
A B C D
E F G H
Electrical entry point
61

Advertisement

loading