Annex A Installation of internal battery

For 10kVA to 30kVA standard UPS, the internal batteries is not provided as standard;
if required, please contact your local agency.
There are 20 batteries of 9AH to be installed for 10kVA.
There are 40 batteries of 7/9AH to be installed for 15/20kVA.
There are 60 batteries of 9AH to be installed for 30kVA.
Fig.6-1 is the installation of battery of the 10kVA standard UPS.
1.Dismantle the covers and crossbeams
2. Install battery and fix the crossbeams
3.Connect the battery cable according
4.Recover the cover
to the series number,
Installation of battery the 10kVA standard UPS
Fig.6-1