Rheem 596160 Owner's Manual And Installation Instructions page 43

Gas boosted water heater
Table of Contents

Advertisement

SUPPLIED WITH VSI160 SOLAR STORAGE TANK – KIT 299651
Part
Item
Description
Number
088143 hex nipple ¾" M x ½" M
1
088150 elbow ½" F x ½" M Rye 2503
2
3
088152 braided flexible hose 272 mm long
12 mm x ½" female cone
Note: Items 1, 2, 4, 6 are in kit 299870, which is part of kit 299651
Other items supplied in kit 299870, outlined in
2 x 088065 fitting (compression) union ½" C x ½" C Rye 4930
Other items supplied in kit 299651, outlined in
3 x 080221 cable tie mounts
GAS INLET
The gas connection is made at the underside of the in-series
gas booster. The pipe work must be cleared of foreign
matter before connection and purged before attempting to
operate the water heater. An isolation valve and
disconnection union must be installed to allow servicing and
removal of the water heater.
Note:
Refer
to
the
AS/NZS 5601.1 for the correct method of sizing the gas
supply pipe to the water heater. The pipe size selection
must take into account the high gas input of the in-series
gas booster
(refer to table on page 33)
other gas appliances in the premises.
Warning: Always isolate the in-series gas booster
before pressure testing the gas supply system. Disconnect
the in-series gas booster after the isolating cock to prevent
the risk of serious damage to the gas control. The Rheem
warranty does not cover damage of any nature resulting
from failure to observe this precaution. Refer to rating label
for gas types and pressures.
TEMPERATURE PRESSURE RELIEF VALVE
The temperature pressure relief valve is shipped behind the lower front cover of the water heater. The
temperature pressure relief valve must be fitted before the water heater is operated. Before fitting the relief
valve, make sure the probe has not been bent.
To fit the relief valve:
Seal the thread with an approved thread sealant such as Teflon tape - never hemp. Make sure tape does
not hang over the end of the thread.
Hand tighten the valve into the opening marked "Relief Valve" (refer to the
page 34)).
Using a spanner engaged on the valve's spanner flats and applying medium pressure to tighten, turn the
relief valve an additional ½ to 1 ½ turns to secure and make the joint water tight, leaving the valve drain
pointing downwards.
Warning: Do not use a pipe wrench or poor fitting tool on the valve body nor over tighten the valve,
as this could damage the valve and prevent safe operation.
"Solar Inlet and Outlet"
"Hot Sensor Lead"
1 x 053114 hot sensor gland
Gas
Installations
Standard
as well as all of the
Part
Item
Description
Number
088151 elbow fitting ½" M x ½" C Rye 4940
4
5
088190 preformed pipe DN15,
insulated with 13 mm diam insulation
088144 fitting union ¾" F x ½" C Rye 5202
6
on page 45, are:
on page 47, are:
9 x 080231 cable ties 150 mm x 3 mm
43
CONNECTIONS – PLUMBING
gas inlet
installation diagram
on

Advertisement

Table of Contents
loading

This manual is also suitable for:

Premier solar ll 160lPremier solar loline

Table of Contents