Download Print this page

Router Installation - MB Connect Line mbNET MDH 810 Technical Data Manual

Hide thumbs Also See for mbNET MDH 810:

Advertisement

2

Router Installation

Installation position/minimum clearances
The router is designed to be mounted on DIN top hat rails (in accordance
with DIN EN 50 022) and for installation in a control cabinet.
The installation and assembly must be carried out according to VDE
0100/IEC 364.
The router may be only mounted vertically as described.
Non-compliance with the minimum distances can destroy the device
at high
ambient temperatures!
Top hat rail mounting
Click the router into the DIN top hat rail. To do this, attach the upper guide to the top hat rail and then press
the router down against the top hat rail until it fully engages.
Page 6 von 7 | MDH800 - MDH859 (from HW 02) - V 6.0 - DE | June 4
NO TI CE
th
, 2019

Advertisement

loading

This manual is also suitable for:

Mbnet mdh 811Mbnet mdh 814Mbnet mdh 815Mbnet mdh 816Mbnet mdh 819Mbnet mdh 830 ... Show all