Installing Work Clamp; Installing Gas Supply - Miller Gold Seal GS-250 Owner's Manual

Table of Contents

Advertisement

2-5. Installing Work Clamp

2-6. Installing Gas Supply

1
2
3
7
6
5
1
2
3
4
5
Tools Needed:
1/2, 3/4 in
4
Tools Needed:
5/8, 1-1/8 in
1
Work Cable
2
Boot
Slide boot onto work cable. Route
cable out front panel opening from
inside.
3
Negative (–) Output Terminal
Connect cable to terminal and
cover connection with boot.
4
Hardware
5
Work Clamp
Route cable through clamp handle
and secure as shown.
Close door.
800 918-C
1
Cylinder Rack
2
Chain
Obtain gas cylinder and chain cylin-
der to rack.
3
Gas Hose Fitting
4
CO
Washer
2
5
Regulator
Install washer and regulator onto
cylinder.
6
Gas Hose Connection
Obtain gas hose with fittings and
install between regulator and weld-
ing power source.
7
Flow Adjust
Typical flow rate is 20 cfh (cubic feet
per hour).
154 623-A / Ref. 109 492
OM-1311 Page 11

Advertisement

Table of Contents
loading

Table of Contents