Step 4: Turn the unit on
1
Check that the pan/tilt lock lever is in the LOCK position.
2
Connect the power cord (supplied) to the AC adaptor (supplied).
3
Connect the AC adaptor to the DC IN connector of the unit.
4
Connect the power cord to a power outlet.
The POWER lamp and NETWORK lamp on the front will light up green when the power-
on process and network connection is completed. This takes approximately 1 minute
after the power is supplied.
25
Start Guide