Event Scheduling - Hitachi 8953H User Manual

Table of Contents

Advertisement

4.4 Event Scheduling

The scheduling function enables to setup scheduled events including power on /
power off. It enables to be "self-management" projector.
NOTE
• You can schedule the following control events: Power ON/OFF, Input
Source and Transferred Image Display.
• The power on / off event has the lowest priority among the all events that are
defined at the same time.
• There are 3 types of Scheduling, 1) daily 2) weekly 3) specific date. (75)
• The priority for scheduled events is as follows 1) specific date 2) weekly 3)
daily.
• Up to five specific dates are available for scheduled events. Priority is given to
those with the lower numbers when more than one event has been scheduled
for the same date and time (e.g., 'Specific day No. 1' has priority over 'Specific
day No. 2' and so on.
• Be sure to set the date and time before enabling scheduled events. (77)
4. Management with Web browser software
93

Advertisement

Table of Contents
loading

Table of Contents