Advertisement

Quick Links

Installation and Operation Manual
AU-1P20002G-230-EU
AU-1P20002G-208/240-US
Email: info@austasolar.com
Web: https://www.austasolar.com/
SAA
152167

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AU-1P20002G-230-EU and is the answer not in the manual?

Questions and answers

ISYAKU ABDULLAHI
June 23, 2025

Please 24v 3kva austa hybrid inverter, what is the minimum PV voltage and maximum PV voltage?

Summary of Contents for Austa AU-1P20002G-230-EU

  • Page 1 Installation and Operation Manual AU-1P20002G-230-EU AU-1P20002G-208/240-US Email: info@austasolar.com Web: https://www.austasolar.com/ 152167...
  • Page 2: Table Of Contents

    CONTENTS COMPANY PROFILE 1. INTRODUCTION 1.1 Prefix 1.2 Grid-tied PV System 1.3 How to Use This Manual 1.4 Label 2. SAFETY INSTRUCTION 3. FCC COMPLIANCE 4. INSTALLATION Parts Included Other Parts and Tools Required Lightning Surge Suppression Installation Procedure Step 1 - Install the AC Branch Circuit Junction Box Step 2 - Attach the AU-1P20002G to the Racking Step 3 - Connect the AU-1P20002G Wiring Harnesses Step 4- Ground the System...
  • Page 3: Company Profile

    COMPANY PROFILE AUSTA SOLAR is a high-tech subsidiary company under OSDA Group, who started solar panel factory since 2009 located in Ningbo,China,including 6GW solar module production capacity. AUSTA SOLAR started inverter R&D research in 2013. Our inverter technology was original from Germany inverter expert which was 3.We are always committed to the...
  • Page 4: Introduction

    Dear customer, thank you for choosing the AUM-2000 micro inverter from FOLLOWING THIS MANUAL IS NOT COVERED BY THE WARRANTEE. Austa. We hope you will find our products meet your need for renewable ALL THE INSTALLATION SHOULD BE DONE BY CERTIFIED ELECTRICIAN.
  • Page 5: Installation

    Step 1 - Install the AC Branch Circuit Junction Box Since the Austa Limited Warranty does not cover “acts of God” such as lightning 1. Measure service entrance conductors to confirm AC service at the site.
  • Page 6: Step 2 - Attach The Au-1P20002G To The Racking

    Step 3 - Connect the AU-1P20002G Wiring Harnesses 2. Mount the adapter plate at a suitable location on the PV racking system (typically Each AU-1P20002G comes with one 3-pin bulkhead receptacle mounted on the at the end of a row of modules). case.
  • Page 7: Step 4- Ground The System

    Step 4 – Ground the system AU-1P20002G connection Map is a diagrammatic representation of the physical location of each AU-1P20002G in your PV installation. The virtual array in Austa Each AU-1P20002G has an integrated ground protection circuit.The grounding micro inverter gateway AUG-256 is created from the map you create.
  • Page 8: Commissioning

    Status: grounding fault 5. COMMISSIONING The LED light is in solid red color. In case of fault, AUM inverter has multiple protective functions and stops output WARNING: CONNECT AU-1P20002G TO THE ELECTRICAL UTILITY GRID ONLY AFTER RECEIVING power. The fault message may be sent to a connected AUG-256 gateway through PRIOR APPROVAL FROM THE UTILITY COMPANY.
  • Page 9 4. Replace the old PLC_ID in the AUG-256 gateway with the new PLC_ID of 7. If the problem persists, please call customer support at Austa. the replacement micro inverter. WARNING: DO NOT ATTEMPT TO REPAIR THE AUM-2000;...
  • Page 10: Specification

    8. SPECIFICATION MODEL AU-1P20002G-240-US AU-1P20002G-208-US MODEL AU-1P20002G-230-EU Max Recommended PV Power (Wp) 700x 4 700x 4 Max Recommended PV Power (Wp) 700x 4 Max DC Open Circuit Voltage (Vdc) Vmax PV (absolute maximum) (Vdc) PV Input Operating Voltage Range (Vdc)
  • Page 11: Warranty And Production Information

    Austa will not be responsible for any defect in or damage to: a) the product if it has been misused, neglected, improperly installed, 9.WARRANTY AND PRODUCTION INFORMATION physically damaged or altered, either internally or externally, or damaged from improper use or use in an unsuitable environment;...
  • Page 12 For the information on our warranty terms and conditions, please see our website: www.austasolar.com/ All fields must be completed in order to process claim. Customer Signature: Date: *All rights reserved by Austa. This information is subject to changes without notice.

This manual is also suitable for:

Au-1p20002g-208-usAu-1p20002g-240-us

Table of Contents